No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
We performed the installation of two automated floodgates with a discharge capacity of 1,500 m³.
We built and installed La Caldera Tank, which has a storage capacity of 15,000 m³.
We performed 1.2 kilometers of dredging, channel rectification and lining.
1,000,000 m³ of earthworks.
We performed 1.2 kilometers of river repair and channeling, and also built retaining walls, sill plates, rebuilt drinking water and drainage networks.
We performed the installation of a 60” diameter welding steel pipeline.
We did 175,470 m2 of tracing and levelling, 42,805 m3 of limestone material, 7,387 m3 of tezontle, control structure construction and 77 m of trapezoidal section for the discharge channel connected to drain Chimalhuacán I.
We performed 5 kilometers of rectification and dredging, and also built 50m long pedestrian and vehicle bridges.
We performed 66,000 m² of cleaning, tracing and levelling, 167,141 m³ of dredging and riverbed rectification, 179,740 m³ of embankment and river bank raising.
Recent Comments